On the 14th of December last year we had our site cut start. We opted to have a level 2 controlled certified fill. This involved a cut from the back of the block and fill at the front. All the fill area had to be compacted to a level of 95% or better.
During the cut section we found an underground spring running through the back section. This caused a huge water seepeage problem and slowed the cut and fill work a little. All the same, the cut/fill was completed on the 16th of December
|
13-12-2011 |
|
14-12-2011 |
|
15-12-2011 |
|
16-12-2011 |