13-05-2012 - The guys have started sheeting the roof. We are using a 55mm roofing blanket under the sheets to improve the thermal performance of the house.



Over the weekend I extended the openings on double roller door. The frames were made with only a 2.1m opening for the roller doors. This was just a little small considering our 2.7m wall heights.

Bottom Plate removed
I managed to squeeze an extra 200mm into the opening, bringing the total height to 2.3m. This will still leave a nice 2 1/2 brick header course above the doors.

All Done
I ran out of daylight on Sunday so I'll have to tackle the second smaller roller door during the week.
Original Height on the single door, and new height on the double door.