Saturday 14 April 2012

Concrete Setup

We spent the rest of the week boxing up the slab, laying the trench mesh, reinforcing mesh, plastic and shower recesses. We were lucky to have the boxing and pickets loaned to us from friends.
It was a huge week of work, with Dan often working 14-15 hour days between his normal job and getting our slab ready.

Also the first stage of the kordon termite barrier was installed around the sub drain pipes.

This photo was taken on Friday the 30th of March, ready for the concrete the next morning.