A good friend of ours, Dan is organising the concrete slab. On the 23-03-2012 he arranged for the pier holes to be dug. Jodie's father, Dennis and I help with cleaning out the excess dirt from the holes and measuring their depth.
It took about 4:30 hours to dig the 46 pier holes required, with the deepest measuring in at 3.4 meters.
No comments:
Post a Comment